23 datasets found

Groups: Infrastructure Tags: public services

Filter Results
  • Monthly Solid Waste Totals

    Monthly solid waste tonnages for the city of Ann Arbor, including commercial and residential sources.
  • Street Trees

    Location of City Street Trees
  • Streetlights

    Locations of City and DTE owned streetlights throughout Ann Arbor
  • Catch Basins

    Locations of public, private, County Drain Commission, and University owned catch basins/inlets as part of the City's greater storm water network.
  • Snow Plow Tracker

    Map that shows location, current actions, and overall progress of city snowplows in real-time via automated vehicle tracking.
  • Pavement Condition and Planned Road Improvements

    This Story Map contains a series of maps and charts that display pavement condition in relation to the city's goals, as well as current and future year street and utility...
  • Sidewalk Gaps Prioritization and Progress

    Map and charts showing the gaps in Ann Arbor's sidewalk network, progress toward filling these gaps, and prioritization of remaining gaps. For more information on new sidewalk...
  • Hydrant Flushing Map

    The City of Ann Arbor conducts annual fire hydrant flushing beginning every spring and continuing on a weekly basis through the fall. This preventative maintenance and...
  • Water Service Line Material

    This dashboard & map track the inventory of water service line materials and the city's progress toward replacing galvanized water lines, as part of
  • Sanitary Pipe Inspections

    Monitor the city's progress toward its annual goals of inspecting its sanitary pipes. Some of these inspections are done with cameras (CCTV), others are done acoustically....
  • Catch Basin Cleaning

    Monitor the city's progress toward its annual goals of cleaning catch basins. Also includes a map of which catch basins have been cleaned this cycle. Change which fiscal year's...
  • Solid Waste Metrics

    Graphs of the solid waste tonnages and percentages, broken out into organics, recycling, and trash. This aims to provide a picture of all residential and commercial waste...
  • Storm Pipe Inspections

    Monitor the city's progress toward its annual goals performing CCTV inspections on its stormwater pipes. These include collectors, inlet leads, and culverts. View activity by...
  • Active City Construction - Road and Utility Projects

    See what roads are planned to be treated in the current construction season, among other City capital projects. See the city's
  • Transportation Map

    A comprehensive transportation map including information on streets and street-related assets and non-motorized/pedestrian facilities throughout the city. For more on current...
  • Street-Cut Moratorium Map

    Map displaying what streets are currently under a street-cut moratorium, streets that will be added to the list in the current construction season, and when the moratorium will...
  • Drinking Water Quality Measures Dashboard

    Ann Arbor Water publishes sample results about the composition of the city's award-winning drinking water. See the mineral content of the water in nearly real-time.
  • Drinking Water and Source Water 1,4-Dioxane Monitoring Dashboard

    City drinking water comes from the Huron River and groundwater wells that are monitored regularly before and after treatment to ensure the drinking water remains safe from...
  • Major Street Mid-Block Crosswalk Streetlight Needs

    This map-based dashboard the status of streetlighting at major street mid-block crosswalks throughout the city. See lighting upgrades by year and prioritization of remaining...
  • City-Maintained Sidewalk Snow Removal

    By default, snow removal from sidewalks is the responsibility of the adjacent property owner. This map indicating the sections of sidewalk on which snow removal is the...
  • Capital Improvements Plan

    Interactive dashboard of the city's six-year capital improvements plan (CIP), including project locations, projected budgets, and scheduling. For more information on the CIP see...
  • Pothole Dispatch Performance

    The City of Ann Arbor aims to fill potholes within 72 hours of receiving the request. This dashboard shows the number of pothole filling service requests received, average time...
You can also access this registry using the API (see API Docs).