-
Street Trees
Location of City Street Trees -
Catch Basins
Locations of public, private, County Drain Commission, and University owned catch basins/inlets as part of the City's greater storm water network. -
Snow Plow Tracker
Map that shows location, current actions, and overall progress of city snowplows in real-time via automated vehicle tracking. -
Pavement Condition and Planned Road Improvements
This Story Map contains a series of maps and charts that display pavement condition in relation to the city's goals, as well as current and future year street and utility... -
Hydrant Flushing Map
The City of Ann Arbor conducts annual fire hydrant flushing beginning every spring and continuing on a weekly basis through the fall. This preventative maintenance and... -
Water Service Line Material
This dashboard & map track the inventory of water service line materials and the city's progress toward replacing galvanized water lines, as part ofSanitary Pipe Inspections
Monitor the city's progress toward its annual goals of inspecting its sanitary pipes. Some of these inspections are done with cameras (CCTV), others are done acoustically....Catch Basin Cleaning
Monitor the city's progress toward its annual goals of cleaning catch basins. Also includes a map of which catch basins have been cleaned this cycle. Change which fiscal year's...Solid Waste Metrics
Graphs of the solid waste tonnages and percentages, broken out into organics, recycling, and trash. This aims to provide a picture of all residential and commercial waste...Storm Pipe Inspections
Monitor the city's progress toward its annual goals performing CCTV inspections on its stormwater pipes. These include collectors, inlet leads, and culverts. View activity by...On-Street Snow Parking Ban Enforcement
During a snow emergency, the city can call a ban on on-street parking for the purpose...City-Maintained Sidewalk Snow Removal
By default, snow removal from sidewalks is the responsibility of the adjacent property owner. This map indicating the sections of sidewalk on which snow removal is the...Pothole Dispatch Performance
The City of Ann Arbor aims to fill potholes within 72 hours of receiving the request. This dashboard shows the number of pothole filling service requests received, average time...